Blog Post

Boilers Installed at Resolven Site

  • By James Erskine
  • 28 Mar, 2017

4 Megawatts of Herz boiler now installed and waiting for commissioning.

No one of eight 500kW fan heat exchangers being fitted, two per boiler. These will supply the hot air for the drying floors below. 
Share by: